Inside a city
- City building permit and city inspections
- Deed restrictions or HOA architectural review
- City water and sewer taps
- City floodplain rules, which can be stricter than the county's

Build on your lot
City lot in Houston or five acres outside Rosharon, the job starts the same way: find out what the lot allows, then design and price the house to fit it.
We start with the lot, not the house. The survey, the deed restrictions, the flood zone, the soil and the utilities decide where the house can sit, how high the slab goes and what the site work costs. Once that's clear, the house gets priced and built like any custom home.

Lot check
Tap what you've got. It's the list we work through before a slab gets poured, and none of it is a reason not to call.
0/6
Start with whatever you have. Even just an address is enough for a first call.
An address is enough for the first call. To price properly we'll want a survey, the deed restrictions if there are any, the lot's floodplain status, and your plans or a clear idea of the house.
No, it just changes the rules. Unincorporated lots often need a well, an aerobic septic system, a culvert permit for the driveway and county floodplain approval instead of city permits.
Usually, yes. The slab has to sit at or above the height your jurisdiction requires, which can mean extra fill or a raised foundation. That height is set before anything else is designed.

Tell us what you have and where it is. We'll tell you plainly what it takes to build it, and what it doesn't.